Lesson 1 of 5
Generate your first envelope
6 min
Model the deemed-to-comply building envelope for a Victorian lot and read its four headline metrics.
The envelope is what makes Land Axis more than a planning map: it takes the zone, the schedule and the Victorian deemed-to-comply standards and draws the building form they allow on this specific lot, then reports the height, storeys, floor area and coverage that come out of it.
- 1
Open the Envelope tab
With a parcel selected, choose "Envelope". Until it is generated the tab reads "Envelope not generated".
- 2
Turn on the model
Switch on "Show on map" in the strip above the tab content. The envelope is calculated for the parcel's zone and drawn on the map.
- 3
Read the confidence badge first
The first row shows either "Deemed to comply" or "Indicative only".
- 4
Read the four headline metrics
- 5
Check what it was measured on
- 6
Note mandatory controls
- 7
Regenerate after changing the site
Common questions
- Which rules does this use?
- Is the envelope a design?